Regarding the project and homeowner use of the South Ridge Center pool

The Hidden Valley Foundation Board of Directors has initiated Phase I of an upgrade to the South Ridge Center.  This upgrade will focus on the snack shack and bathrooms and is necessary to comply with state and local codes. The Board presented a conceptual design plan to homeowners at the November 17, 2018 Annual Members Meeting. The conceptual design plan is also available for review at https://hvftoday.com/index.php/south-ridge-project and at the Hidden Valley Foundation Office.   The Board will use the results of this survey to gather input regarding the project and homeowner use of the South Ridge Center. This feedback will be valuable to the board in finalizing the details of the Phase I plans, and will be utilized by the Board in planning other potential updates to the South Ridge Center after the Phase I compliance updates are completed.

Connect With Us

1900 South Ridge Drive, PO Box 4180

Hidden Valley, PA 15502

  • dummy+1 (814) 443 3001

  • dummy+1 (814) 443 3736

  • dummy help@hvftoday.com

Cloudy

39°F

Hidden Valley

Cloudy
Humidity: 92%
Wind: E at 18 mph
Monday
Mostly cloudy
27°F / 38°F
Tuesday
Partly cloudy
25°F / 30°F
Wednesday
Partly cloudy
25°F / 44°F
Thursday
Showers
32°F / 41°F
Friday
SP_WEATHER_RAIN_AND_SNOW
38°F / 46°F
Saturday
SP_WEATHER_RAIN_AND_SNOW
31°F / 38°F
Sunday
Mostly cloudy
29°F / 31°F